Argentina has no trade agreement with China, so the full duty applies — and the harder part is often not the tax but the payment: Central Bank rules decide when you may buy dollars to pay the factory. Here is what a company in Argentina pays and prepares when it buys equipment from a Chinese factory — checked against official Argentine sources in November 2026.

Duty: from 0% to 35%, depending on the code
Argentina applies the Mercosur Common External Tariff with national exceptions. Mercosur has no trade agreement with China, so goods from China pay the full rate. Rates in force in November 2026 for typical equipment: lithium-ion batteries (8507.60) — 18%; computers and mini PCs (8471.41, 8471.50) — 0%; monitors designed for use with a computer (8528.52) — 0%, other monitors (8528.59) — 20%; UPS (8504.40.40) — 12.6%; other static converters (8504.40.90) — 2%; battery chargers (8504.40.10) — 35%; industrial robots (8479.50) — 2%; other machines (8479.89.99) — 12.6%, or 2% for the items listed as capital goods.
Battery storage in a container has its own line: 0% applies only to interconnected batteries forming up to 18 modules of no more than 2,500 V each, with fire-suppression, cooling and control equipment, all housed in a metal container. All the conditions must be met; batteries that do not meet them pay 18%. Inverters, UPS and chargers share heading 8504.40 but pay 2%, 12.6% and 35%, so the description and the datasheet must support the code your customs broker declares.
Colour monitors (8528.52 and 8528.59) also pay a 9.5% internal tax (impuestos internos) until 31 December 2038. Projects admitted to the large-investment regime (RIGI) import new capital goods, parts and components free of import duty, the statistics fee and tax perceptions.
→ Commercial storage cabinet 20–50 kW / 80–120 kWh · High-voltage battery stack, 10–42 kWh · Three-phase hybrid inverter, 8–20 kW · Interactive flat panel 65″–86″, 4K, Android 16 with Google apps
Statistics fee, VAT and the perceptions
The statistics fee is 3% of the customs value until 31 December 2027, capped at US$180 for values up to US$10,000, US$3,000 up to US$100,000, US$30,000 up to US$1 million and US$150,000 above. On 30 September 2026 a federal court of first instance, in a case brought by one importer, declared the 3% unconstitutional and ordered a refund of what that company paid above 0.5%.
VAT (IVA) at customs is 21%, or 10.5% for the capital goods and other items listed in article 28 of the VAT law; it is charged on the customs value plus the duty and the statistics fee. On top of that, customs collects perceptions: a VAT perception of 20% (10% for goods taxed at 10.5%), an income-tax perception of 6% and, in provinces that take part in the SIRPEI system, a gross-income tax (Ingresos Brutos) perception at the rate each province sets. They are advance payments of those taxes: a registered company credits them later under each tax's rules, but the cash is tied up until then. Goods the importer will use as its own fixed assets (bienes de uso) are excluded from the income-tax perception and, for a VAT-registered importer, from the VAT perception when their useful life exceeds two years; the exclusion is declared with a code in the import declaration, and without the code the perception is charged. For a VAT-registered storage company that imports containers as fixed assets of its own plant, this removes both perceptions.
Until 31 December 2026, imports of certain basic goods, and of listed inputs by small and medium companies with a valid MiPyME certificate, are exempt from the VAT and income-tax perceptions (ARCA General Resolution 5868/2026 extended the earlier exemptions); check with your customs broker whether your code is on the lists. The PAIS tax on foreign currency purchases applied until 22 December 2024, and since 26 February 2025 imports no longer need the SEDI advance declaration.
Paying the factory: what the Central Bank allows
Argentine banks sell dollars for imports under the rules of the Central Bank (BCRA). Once the goods are registered at customs, the importer may pay the supplier from that date, with no waiting period. Before customs entry, payment is allowed only in the cases the rules list.
Small and medium companies (MiPyME) and individuals may pay at sight or settle commercial debt for goods shipped from origin since 14 April 2025 — that is, after shipment, not as a deposit before production. For capital goods — tariff codes marked BK — any importer may pay up to 30% of the FOB value in advance, and up to 80% including sight payments; a mixed order counts as capital goods when BK items make up at least 90% of its FOB value and the rest are parts or accessories for them. Any importer may also pay at sight with its own dollars held in a local bank or with a local dollar loan, and pay capital goods in advance the same way.
After an advance payment, the goods must be registered at customs within 270 days for capital goods and 90 days for other goods; if the supplier is related to the importer, the bank needs the BCRA's prior approval. Prior approval is also needed for new advance payments by a company formed less than a year earlier once its advance payments still awaiting customs entry, including the new one, exceed US$5 million — which matters for a newly formed project company. Static converters (8504.40.90) and industrial robots (8479.50) are marked BK; lithium-ion batteries (8507.60) and monitors (8528.59) are not, and UPS (8504.40.40) are marked BIT, not BK.
In practice a Chinese factory usually asks for a deposit before production. For batteries or displays, which are not BK, such a deposit through the official exchange market needs one of the special routes in the rules, such as a loan from a local bank funded by a foreign credit line, export pre-financing or a foreign loan. Ask your bank whether a letter of credit paid at sight against the shipping documents fits your case, and agree the payment terms with the bank before you sign with the factory.
→ Incoterms® rules when buying from China: EXW, FCA, FOB or CIF — which to choose
Electrical safety certificate
Electrical equipment sold in Argentina needs a safety certificate under Resolution 16/2025 of the Secretariat of Industry and Commerce, which replaced Resolution 169/2018 on 26 February 2025. Battery chargers for appliances, power tools, e-bikes, scooters and electric vehicles, power supplies, solar inverters (IEC 62109-1 and -2) and UPS (IEC 62040-1 or IEC 62477-1) are in one group: units above 5 kVA are excluded (vehicle chargers only above 23 kVA), and a certificate is first issued for two years. Monitors and desktop computers are in the electronics group: devices above 5 kVA are excluded, and a certificate is first issued for four years. After that, a certificate stays valid with the certification body's surveillance. Batteries on their own are not on the list. A power adapter supplied with a device must meet the power-supply rules.
A recognised certification body issues the certificate and may rely on IECEE CB Scheme test results; the manufacturer or importer also signs a declaration of conformity. In the electronics group only, professional equipment is exempt from certification and marking if a declaration of conformity with the datasheet or manual proves professional use, and the import declaration must state it; this exemption does not cover inverters, UPS or chargers. Industrial machines and machine equipment (IEC 60204) up to 63 A and 5 kVA fall under a separate Resolution 17/2025; check with the certification body whether it covers your machine, for example an industrial robot.
→ UPS for a server room or a local AI computer: which type, which battery and what size · Hybrid inverters for business: how to choose one
Wi‑Fi and Bluetooth: ENACOM homologation
New telecommunications equipment for sale — including devices with a Wi‑Fi or Bluetooth interface, such as interactive panels, kiosks, robots or mini PCs — needs homologation by the communications regulator ENACOM and an entry in its RAMATEL registry before it is sold, and a company that imports such equipment for sale registers in RAMATEL as an importer. The new RAMATEL regulation approved by ENACOM Resolution 57/2026 takes effect on 1 December 2026 (Resolution 843/2026): entries made under the old rules until then are valid for three years, while entries under the new rules do not expire.
→ Interactive flat panels for classrooms: how to choose one and what it costs · Self-ordering kiosks for restaurants: how to choose one, connect payments and receipts, and what it costs
Grid-connected inverters and grid-scale storage
Inverters for distributed generation under Law 27,424 must be certified to IRAM 210013-21, or to IEC 62109-2 together with IEC 62116 or VDE 0126-1-1, and meet VDE-AR-N 4105 or RD 1699.
The AlmaSADI tender (Energy Secretariat Resolution 50/2026) contracted battery storage on the national grid that delivers at least four consecutive hours, with a 700 MW target; the awards were made by Resolution 155/2026. Commercial operation requires CAMMESA's Technical Procedures No. 1 and No. 4 and enabled metering, communication and real-time operation equipment, no later than 31 December 2029. The agreement runs for up to 15 years from commercial operation or from 1 January 2027, whichever comes first. Until commercial operation the winner pays CAMMESA US$4,000 per MW of contracted power on award and then every quarter through 2027, US$6,000 per quarter in 2028 and US$8,000 in 2029; at commercial operation these payments are refunded in full if it comes by 30 June 2027, 75% by 30 June 2028 and 50% by 31 December 2029. A late container costs three times: the quarterly payments continue, the refund shrinks, and the paid term gets shorter.
→ AlmaSADI contracts: what to demand from a Chinese battery supplier · Battery storage for business: how to size it, what to check and what it costs · Hybrid inverters for business: how to choose one
Energy labels, lithium batteries and origin
Energy-efficiency labels are mandatory for 11 groups of appliances — refrigerators, washing machines, air conditioners, microwave ovens, storage water heaters, lamps, televisions, induction motors, dishwashers, electric ovens and pumps; batteries, inverters, UPS, computers and robots are not among them.
Batteries and devices with batteries travel as dangerous goods: the batteries must have passed the UN 38.3 tests, and the manufacturer must make the test summary available — the carrier or forwarder may ask for it.
Without a trade agreement, a Chinese certificate of origin brings no duty reduction. Proof of origin is required only for goods subject to anti-dumping, countervailing or specific duties or safeguards: a sworn declaration of non-preferential origin filed online with the import clearance.
Documents for the shipment
Commercial invoice in the importer's name with the issuer, quantity, description, sale terms and value — the bank checks it when you pay; bill of lading or air waybill; packing list; insurance policy if you buy CIF or CIP; electrical safety certificate and declaration of conformity, or the professional-equipment declaration (electronics only); ENACOM homologation for radio devices; for batteries — the UN 38.3 test summary; a sworn declaration of non-preferential origin only if anti-dumping or similar measures apply.
How we help
We match the model to your project and its Argentine requirements, and agree payment terms with the factory that your bank can process. Before production we request the documents customs and certification bodies need — CB reports, IEC test reports, the UN 38.3 summary, datasheets that support the tariff code — and check them against the goods before shipment. Your customs broker (despachante de aduana) in Argentina classifies and clears the cargo; we prepare what they need from the factory.
Rules and rates were checked in the Boletín Oficial and on the websites of ARCA, the Central Bank (BCRA), ENACOM and the Energy Secretariat in November 2026 and can change. Confirm them with your customs broker and your bank before you order.